Military Wiki
Register
Advertisement
USS Peoria (PF-67)
USS Peoria, June 1945
Peoria off Charleston, South Carolina, following modification to a weather ship, c. June 1945
Career (United States) US flag 48 stars
Name: USS Peoria
Builder: Leatham D. Smith Shipbuilding Company, Sturgeon Bay, Wisconsin
Launched: 2 October 1943
Completed: 25 May 1943
Commissioned: 2 January 1945
Decommissioned: 15 May 1946
Struck: 19 June 1946
Fate: Sold to Cuba, 16 June 1947
Career (Cuba) Flag of Cuba
Name: Antonio Maceo (F302)
Namesake: Antonio Maceo Grajales
Acquired: 16 June 1947
Fate: Sunk as a target, 1975
General characteristics
Class & type: Tacoma-class frigate
Displacement: 1,264 long tons (1,284 t)
Length: 303 ft 11 in (92.63 m)
Beam: 37 ft 11 in (11.56 m)
Draft: 13 ft 8 in (4.17 m)
Propulsion: 2 × 5,500 shp (4,101 kW) turbines
3 boilers
2 shafts
Speed: 20 knots (37 km/h; 23 mph)
Complement: 190
Armament: • 3 × 3"/50 caliber guns (3×1)
• 4 × 40 mm guns (2×2)
• 9 × 20 mm guns (9×1)
• 1 × Hedgehog anti-submarine mortar
• 8 × Y-gun depth charge projectors
• 2 × depth charge tracks

USS Peoria (PF-67), a Tacoma-class frigate, was the third ship of the United States Navy to be named after Peoria, Illinois.

Construction[]

Peoria was constructed by the Leatham D. Smith Shipbuilding Company, and was completed in Sturgeon Bay, Wisconsin on 25 May 1943. Launched on 2 October 1943, sponsored by Agnes Reynolds, she was commissioned on 2 January 1945 at Houston, Texas, under the command of Commander George R. Leslie, USCG.

Service history[]

USS Peoria (PF-67) at Sturgeon Bay

Peoria fitting out at Sturgeon Bay, Wisconsin, January 1944

Peoria's shakedown voyage (or sea trial) commenced on 12 January 1945, bound for the North Atlantic Ocean around Bermuda, and returned successfully to Norfolk, Virginia. Peoria's first mission, begun on 4 March, was to sail with a convoy for the British Crown colony of Gibraltar. Peoria then continued on to Mers El Kébir, Algeria, concluding her journey on 19 March. She joined a returning convoy from Oran on 27 March, assigned with escorting it to the United States. Peoria then spent a brief amount of time at New York, until she was called out for use in anti-submarine training at Casco Bay, Maine. On 7 May, she departed Casco Bay bound for New London, Connecticut. Peoria arrived at New London in time for VE day, as World War II concluded. Peoria spent two weeks training submarine crews at New London.

On 21 May, Peoria left New London, assigned to Charleston, South Carolina, where she was to be fitted out for patrol duty in the Atlantic. Peoria was used for weather station work from 21 June, visiting stations in North Atlantic ports from Bermuda to Iceland for a further year.

Decommissioning and sale[]

On 15 May 1946, Peoria was officially decommissioned, and her name was removed from the Navy List four days later. Her sale to Cuba was overseen by the Foreign Liquidation Commission, part of the State Department. Peoria was renamed Antonio Maceo (F-302) on 16 June 1947, and served in the Cuban Navy until 1975, when she was sunk.

References[]

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.

External links[]


All or a portion of this article consists of text from Wikipedia, and is therefore Creative Commons Licensed under GFDL.
The original article can be found at USS Peoria (PF-67) and the edit history here.
Advertisement