Military Wiki
Register
Advertisement
MRAP
FPCougar
An MRAP Cougar HE tested in January 2007, with landmines detonating around it.
Type Armored personnel carrier (wheeled)
Service history
In service 2007–present[1]
Used by United States United States Armed Forces
Flag of the International Security Assistance Force International Security Assistance Force
Wars Iraq, Afghanistan
Production history
Manufacturer various
Specifications
Mass 14+ tons

Mine-Resistant Ambush Protected (MRAP; /ˈɛmræp/ EM-rap) vehicles are armored fighting vehicles used by various armed forces, whose designed purpose is surviving improvised explosive device (IED) attacks and ambushes. The first development in armored vehicles designed specifically to counter the land mine threat were initiated during the Rhodesian Bush War; existing technology was subsequently inherited (and matured) by the South African Defence Force after 1980.[2]

General information[]

There is no common MRAP vehicle design, as there are several vendors, each with its own vehicle. Originally Brig. General Michael Brogan, and now Brig. General Frank Kelley, Commander, United States Marine Corps Systems Command, is in charge of the Marine MRAP program.[3][4] Kevin Fahey, U.S. Army Program Executive Officer for Command Support and Combat Service Support,[5] manages the Army MRAP program.[6] The Marine Corps had planned to replace all Humvees in combat zones with MRAP vehicles, although this appears to have changed.[7][8][9][10] As armored vehicles are considered an "urgent need" in Afghanistan, this program is primarily funded under an "emergency war budget". On 8 May 2007, Secretary of Defense Robert Gates said that the acquisition of MRAPs is the Department of Defense's highest priority,[11] so for fiscal year 2007 $1.1 billion is earmarked for MRAP.[12] Gates decided to ramp up MRAP orders after the Marines reported in 2004 that no troops had died in more than 300 IED attacks on Cougars [13] As of May 6, 2008 eight soldiers had been reported killed in the thousands of MRAPs in Iraq, according to news service Knight Ridder.[14]

In June 2008, USA Today reported that roadside bomb attacks and fatalities were down almost 90% partially due to MRAPs. "They've taken hits, many, many hits that would have killed soldiers and Marines in unarmored Humvees", according to Adm. Michael Mullen, chairman of the Joint Chiefs of Staff. Maj. General Rick Lynch, who commanded a division in Baghdad, told USA Today the 14-ton MRAPs have forced insurgents to build bigger, more sophisticated bombs to knock out the vehicles. Those bombs take more time and resources to build and set up, which gives U.S. forces a better chance of catching the insurgents in the act and stopping them.[15] The Taliban is also focusing their efforts away from anti-material IEDs and more toward smaller anti-personnel bombs that target soldiers on patrol.[16]

This program is very similar to the United States Army's Medium Mine Protected Vehicle program.[17]

Design[]

File:Army mil-2008-06-13-162413.jpg

Writing on the door of an MRAP reads "This truck saved my life as well as 5 others on 02 Apr 08 at 2300 L in Basrah, IZ."

MRAP vehicles usually have "V"-shaped hulls to deflect explosive forces originating below the vehicle, thereby protecting the vehicle and its passenger compartment.[citation needed] Typically, these explosions are from land mines, but they can also be IEDs. This design dates to the 1970s when it was first introduced in specialized vehicles built by and for the Rhodesian army, and further developed by South African manufacturers, starting in 1978 with the Buffel (Buffalo) armored personnel carrier (APC).[citation needed] However, the TSG/FPI Cougar (designed by a British-led U.S. team in 2004 for a U.S. Marine Corps requirement[citation needed]) became the springboard from which the MRAP program was launched.

Multiple contracts have been placed by the U.S. for this type of vehicle in response to the situation in the Iraq War. By issuing contracts to several companies, the Marine Corps hopes to accelerate the rate of production, to expedite the delivery of vehicles to deployed forces. However, there are only two steel mills in the U.S., Oregon Steel Mills and International Steel Group, qualified to produce steel armor for the Defense Department, which has been in negotiations to ensure enough steel is available to keep pace with production.[12] The concept was to replace Humvee-type vehicles with a more robust, survivable vehicle when on patrol "outside the wire".

Designs were submitted by the following companies.

  • Armor Holdings (acquired by BAE Systems on 31 July 2007)[18]
  • BAE Systems
  • Force Protection Inc (FPI)
  • General Dynamics Land Systems (GDLS)
  • General Purpose Vehicles (GPV)
  • Navistar International Military Group (IMG)
  • Oshkosh Truck
  • Protected Vehicles Incorporated (PVI)
  • Textron Marine and Land Systems

Orders[]

1st MaxxPros in Iraq

First MaxxPros fielded in Iraq

MRAP04

The last vehicle from Iraq returned to U.S. This vehicle arrived at the Port of Beaumont, Texas, Sunday, May 6th, 2012, and was unloaded from the ship on Monday, May 7th, 2012.[19]

MRAP deployment[]

The MRAP program was prompted by U.S. deaths in Iraq.[20] As recently as 2007, the U.S. military has ordered the production of about 10,000 MRAPs at a cost of over $500,000 each, and planned to order more MRAPs. [21] Partial list of orders under the MRAP program:

  • On 30 January 2007, FPI received an order for two Cougar H and two Cougar HE vehicles for testing and evaluation by the USMC for the MRAP program.[22]
  • On 14 February 2007, the Marine Corps Systems Command placed a $67.4 million delivery order for 65 Category I Cougar H vehicles and 60 Category II Cougar HE vehicles,[23] as well as a $55.4 million delivery order 15 Category I BAE RG-33 vehicles, and 75 Category II BAE RG-33L vehicles, built in York, Pennsylvania.
  • On 24 April 2007, the Marine Corps Systems Command placed a $481.4 million order with Force Protection for 300 Category I Cougar H vehicles and 700 Category II Cougar HE vehicles.[7]
  • On 31 May 2007, the Marine Corps Systems Command ordered 1200 Category I International MaxxPros at a cost of $623 million.[24]
  • On 1 June 2007, FPI received an order for 14 Category III Buffalo vehicles from the Marine Corps Systems Command. The contract is worth an approximate $11.9 million and is scheduled for completion by spring 2008.[22]
  • On 19 June 2007, the Navy placed an order on behalf of the Marine Corps and Army for 395 Category I, 60 Category II Force Protection Cougars at a cost of $221 million, and for 16 Category II International MaxxPro XLs for the sum of $8 million.[25]
  • On 28 June 2007, amended July 16, 2007, BAE Systems received a $235.8 million order for 16 RG-33 Category I patrol vehicles, 239 RG-33L Category II vehicles, 170 RG-33 Category I variants for the United States Special Operations Command, out of their total allotment of 333 vehicles, and 16 RG-33L Category II Ambulance variants, which are the first vehicles in the competition specifically listed for the ambulance role.[26][27]
  • On 13 July 2007, Stewart & Stevenson (Armor Holdings) received an order for 1,154 Category I and 16 Category II MRAP vehicles from the Marine Corps Systems Command. The vehicles are for delivery by February 2008 and the order is worth $518.5 million.[28]
  • On 20 July 2007, IMG received an additional order for 755 I MaxxPro MRAP vehicles.[29]
  • On 6 August 2007, General Dynamics Land Systems Canada received an order for 600 MRAP Category II RG-31 vehicles. The contract is worth $338.7 million. Manufacturing will be done by the Demmer Corporation of Lansing, Michigan, in addition to BAE OMC of Benoni, South Africa. Deliveries will be completed by March 2008.[30][31]
  • On 10 August 2007, the Marine Corps Systems Command placed a USD $69.8m order with Force Protection for 25 Category 1 Cougar H vehicles and 100 Category II Cougar HE vehicles.[32]
  • On 18 October 2007, the Pentagon placed additional orders for one thousand Category I vehicles from IMG (worth $509 million), 533 Category I and 247 Category II vehicles from Force Protection (worth $377 million), and 399 standard Category II, 112 ambulance-configured Category II RG-33L vehicles (worth $278 million) from BAE Systems. BAE also received a separate $44 million order for 89 RG33 Mod 5 (Category I) vehicles, for the U.S. Special Operations Command. GDLS and Armor Holdings were informed that they will receive no further orders in the MRAP program.[33][34]
  • On 18 December 2007, the U.S. military placed its final orders of year 2007. These went to Navistar for 1,500 Category I MaxxPros (worth $1.12 billion), BAE for 600 Category II vehicles ($645 million), Armor Holdings (though BAE) for 668 Category II vehicles (worth $458 ), and Force Protection for 178 Category I and 180 Category II Cougars ($378 million).[35]
  • On 14 March 2008, the U.S. military placed its first orders of 2008. 1,024 Category II Caiman's were ordered from BAE (worth $481.8 million), 743 Category I MaxxPros were ordered from Navistar ($410.7 million), and special command vehicles and ambulances were ordered from BAE ($234 million).[36]
  • On 17 July 2007, the U.S. Marine Corps System Command placed an order with General Dynamics Land Systems Canada for 773 RG31 Category I MRAPs ($552M) for delivery by April 2009.[37]

2008[]

  • On 2 January 2008, Navistar Defense produced the 1,000th International MaxxPro Mine-Resistant Ambush Protected (MRAP) vehicle.[38]

2009[]

Oshkosh Corp., Oshkosh, Wisconsin, is being awarded a $1,064,463,100 firm-fixed-priced delivery order under previously awarded firm-fixed-price contract W56HZV-09-D-0111 to exercise an option for 1,700 Mine-Resistant Ambush Protected (MRAP) All Terrain Vehicles. The Navy contract value is $1,064,463,100. A similar Army contract for 1,700 Mine-Resistant Ambush Protected (MRAP) All-Terrain Vehicles is valued at a further $1,063,700,000.[39] By 2009 the US Department of Defence had spent $20 billion on the MRAP program.[40] Total MRAP program expenditure when final deliveries are accepted is expected to cost $48.5 billion (FY10-11).

Parallel programs[]

Orders of vehicles associated with the MRAP program:

Categories[]

COL Curry & his Cougar2

American serviceman alongside his MRAP Cougar, Ramadi, Iraq, in 2008

The MRAP class is separated into three categories according to weight and size.

Category I (MRAP-MRUV)[]

The Mine-Resistant Utility Vehicle (MRUV) is smaller and lighter, designed for urban operations.

Navistar MaxxPro

International MaxxPro Category 1 MRAP

Category 1 MRAP vehicles ordered or currently in service:

  • BAE Caiman 4x4 - 2,800 ordered.[28][41][42]
  • BAE OMC RG-31[43]
  • BAE RG-33 4x4[44]
  • Force Protection Cougar H 4x4 - 1,560 vehicles ordered.[7][45]
  • International MaxxPro - 5,250 vehicles ordered.[24][46][47]
  • Textron M1117 Guardian - Removed from competition. As of May 18, 2007, has been notified by the USMC that they will not be receiving any additional orders as part of the MRAP program.[48]
  • Protected Vehicles Inc./Oshkosh Truck Alpha - Although 100 vehicles were initially ordered, Oshkosh was notified by the Marine Corps on June 29, 2007 that it would receive no further orders for the PVI Alpha due to "concern regarding overall vehicle survivability" and other fundamental design deficiencies of an automotive and ergonomic nature, adding that remediation "would require significant redesign".[49][50]

Category II (MRAP-JERRV)[]

The Joint Explosive Ordnance Disposal (EOD) Rapid Response Vehicle (JERRV) is designed for missions including convoy lead, troop transport, ambulance, explosive ordnance disposal and combat engineering.

Category II MRAP vehicles ordered or currently in service:

  • Force Protection Cougar HE 6x6 - 950 vehicles ordered.[7]
  • BAE RG-33L 6x6
  • GDLS RG-31E - 600 vehicles ordered.[30]
  • Thales Australia Bushmaster IMV - Has been removed from the competition as of 2007-08-07. According to a Thales press release, "The Thales Bushmaster vehicle offer for the US MRAP Phase 1 Program was not selected due to an evolving requirement, not due to a lack of marketing or lobbying effort…. Thales and Oshkosh remain confident of future potential sales of Bushmaster under ongoing Phases of MRAP in the US."[51]
  • Protected Vehicles Inc Golan - 60 vehicles initially ordered, then when the Golan was eliminated from the competition all vehicles were discarded by the Marines.[52]
  • International MaxxPro XL - 16 vehicles ordered.[53]
  • BAE Caiman 6x6 - 16 vehicles ordered.[28]

Category III[]

  • Force Protection Buffalo MRV
  • Dedicated mine- and IED-clearing functionality.
  • Seating to carry six personnel.

Criticism[]

The deployment of MRAP vehicles has not been without criticism. The most common are concerns about the high cost ($17.6 billion program), potential logistical difficulties due to high fuel consumption and varied designs, a greater disconnection between troops and the local population due to their massive size and menacing appearance (conflicting with current counter-insurgency (COIN) strategy), and what U.S. military will do with them following a U.S. withdrawal from the current conflict in Iraq since they are expensive to transport and operate (some speculate they may be sold or donated to Iraq, or put in storage in America.)[54][55] MRAP funding has pulled money away from other tactical vehicle programs, most noticeably the Humvee replacement, the Joint Light Tactical Vehicle, which has been delayed by two years.[56] According to Army Times, some troops openly wonder about the design of some versions of the MRAP. Some examples are: why the rear seats face inward and not outward in such a way they could fire their weapons through ports, which some versions lack. The height and steepness of the dropdown stairs at the rear of the some versions can make exiting the vehicle dangerous. Troops riding in the rear can hit their head on the ceiling while bouncing around in rough terrain. Medics told the Army Times that a soldier broke his neck after bouncing his head on the overhead, and another is said to have seriously damaged his skull after slamming into a protruding bolt in the overhead while wearing a soft cover.[57]

The MRAP has been well received in the field, where US troops have expressed their fondness for the MRAP, stating that they would prefer to be hit by an IED in an MRAP than a Humvee.[58] [59]

Rollovers and electric shock[]

Caimanrollover

A Caiman after rolling into a ditch.

A June 13 report by the Marine Corps Center for Lessons Learned indicated concerns about MRAP vehicles rolling over in combat zones. The V-shaped hulls of the MRAP give it a higher center of gravity and the weight of the MRAP can cause the poorly built or maintained roads in rural Iraq or Afghanistan to collapse. Of the 66 MRAP accidents between November 7, 2007, and June 8, 2008, almost 40 were due to rollovers caused by bad roads, weak bridges, or driver error. In many of the rollovers troops were injured, and in two separate incidents five soldiers have been killed by rolling over into a canal and getting trapped under water. The report said 75% of all rollovers occurred in rural areas often when the road is above grade and a ditch or canal full of water is next to it. The same report raised concerns associated with MRAP vehicles snagging on low-hanging powerlines in Iraq or its antennas getting close enough to create an electric arc, which may lead to electrocution of passengers. The person located in the gunner's hatch is at the highest risk.[57][60]

Effectiveness[]

Cougar Hit By IED

MRAP Cougar hit by a large IED in Iraq, all crew survived

The MRAP may not be effective against Explosively Formed Penetrators (EFP), which use an explosive charge to propel a specially shaped metal plate at high velocity while simultaneously deforming it into an armor-piercing projectile. Use of EFPs more than doubled in 2006 and is expected to continue to increase.[61] [62] In 2007, 11 percent of all roadside bomb fatalities were due to EFPs.[63] However, the Marines estimate that the use of the MRAP could reduce the casualties in Iraq due to IED attacks by as much as 80 percent.[64] The alleged MRAP weakness is being addressed by the next-generation MRAP II. As an interim solution, the military is currently installing a variant of the Humvee's IED defeating Frag Kit 6 armor, which adds significant weight, as well as width to the already large and heavy vehicle.[4] In July 2008 the U.S. military reported the number of EFP attacks had dropped by 70 percent.[65]

On 19 January 2008 a 3rd Infantry Division U.S. Army soldier operating as the exposed turret gunner, was killed in a Navistar MaxxPro MRAP vehicle by an ANFO IED estimated at 600 lb.[66] It is unknown whether the gunner was killed by the explosion or by the vehicle when it rolled over after the blast. However, the vehicle’s v-hull was not compromised. The crew compartment also appeared to be uncompromised in the attack, and the three other crew members who were inside the vehicle survived; one with a shattered left foot, a broken nose and several broken teeth; one with a fractured foot; and the third unhurt.[66][67][68][69] Although this was reported as the first MRAP combat death, later reports clarified that several soldiers had been killed by IEDs in RG-31s and by EFPs in Buffalos before this incident.[70]

Logistics[]

US Navy 080113-N-0292S-066 Mine resistant ambush protected vehicles (MRAP) are offloaded from the Military Sealift Command roll-on-roll-off ship USNS Pililaau (T-AKR 304) onto the pier

Mine resistant ambush protected vehicles (MRAP) are offloaded from the Military Sealift Command roll-on/roll-off ship USNS Pililaau (T-AKR 304) onto the pier.

Several criticisms of the MRAP program have been its lack of a common design, which presents a wartime logistical challenge, and the relatively low number of units which have been delivered to Iraq and Afghanistan, despite large orders.[4] However, some analysts see the diversity of MRAP vehicles as an advantage.[71] Other criticisms include the vehicle's weight and size, which severely limit its mobility off main roads, in urban areas, and over bridges.[72] 72 percent of the world's bridges cannot hold the MRAP.[73] Its heft also restricts several of the vehicles from being transported by C-130 cargo aircraft or the amphibious ships that carry Marine equipment and supplies. Although three MRAP vehicles (or five Oshkosh M-ATV's) will fit in a C-17 aircraft, airlifting is extremely expensive, at $150,000 per vehicle, according to estimates by the U.S. Transportation Command.[74] In an effort to rush more vehicles to the theater, the US Air Force contracted several Ukrainian Antonov An-124 heavy-cargo aircraft, which became a familiar sight above cities such as Charleston, South Carolina where some MRAPs are produced.[75] For comparison, sealifting costs around $13,000 per vehicle, but takes 3–4 weeks for the vehicle to arrive in theater.[76] In December 2007, the Marine Corps reduced its request from 3,700 vehicles to 2,300.[10] The Army is also reassessing its MRAP requirements in Iraq.[77][78] In January 2010, 400 were flown in to Afghanistan, increasing to 500 a month in February, but the goal of 1,000 a month was delayed because of difficulty in distribution and training.[74]

MRAP II[]

USAFMRAP

A member of the United States Air Force stands in front of an MRAP in Southwest Asia.

Caiman mine-resistant, ambush-protected vehicles in Iraq

Caiman mine-resistant, ambush-protected vehicles in Iraq.

Nuvola apps kview External images

Searchtool The Bull APC[dead link]

[79]

On July 31, 2007, the Marine Corps Systems Command launched an MRAP II pre-solicitation, to develop a new vehicle that offers a higher level of protection than the current MRAP vehicles, particularly from advanced threats such as explosively formed penetrators.[80] While the Frag Kit 6 was designed to meet the threat of EFPs, the MRAP II competition's purpose was to find a vehicle that didn't need the upgrade kit. The U.S. Army Research laboratory worked to ensure the technologies used in Frag Kit 6 would be available to MRAP II designers.

In addition, the new solicitation was designed to provide the Joint Program Management Office with a greater flexibility to increase production capability and provide vehicles with enhanced protection and performance to meet future near-term requirements.[81] Full text of the solicitation can be found.[82]

The initial testing at the Aberdeen Proving Grounds served to disqualify vehicles that didn’t meet requirements. Competitors who did not receive MRAP-II orders include Force Dynamics (reinforced Cougar), GDLS Canada (upgraded BAE OMC RG-31), Navistar subsidiary IMG (upgraded MaxxPro), Textron's upgraded M1117, and Protected Vehicles, Inc. (upgraded Golan vehicle, with improved side doors and different armor; arrived on last day).[83] Blackwater USA (Grizzly APC with Ares EXO Scale appliqué armor) was later disqualified due to a limited amount of armor in the frontal area of the vehicle.

There were two eventual winners of the competition. The first was an upgraded Caiman, originally designed by Armor Holdings which was later acquired by BAE Systems. The second winner was the Bull, a combined effort between Ideal Innovations Inc, Ceradyne and Oshkosh. Both of the winning designs weighed 40,000 lb or more.

According to the Army Times, the Pentagon has already decided to buy first-generation 14- to 24-ton MRAP I vehicles with extra Frag Kit 6-derived armor, not the 30-ton MRAP II vehicles, when it places its final MRAP orders. Orders are expected at the end of summer in 2008 after a field commander's report on MRAP.[84] The Army Times also reported the Pentagon may also buy some shorter, lighter MRAPs in their final batch. A senior Pentagon official told them that "the roads are caving in" under the weight of MRAPs and "We want it to weigh less than it weighs now.”[85]

Plans to integrate developing technology[]

Permissions-Errors-Rg-33

A RG-33 convoy with the Common Remotely Operated Weapon Station (CROWS) system installed.

There currently are plans to integrate the Crows II remote weapon station, the Frag Kit 6 anti-EFP armor, and the Boomerang anti-sniper system on many MRAPs in combat.

MRAP M-ATV[]

On 30 June 2009, the Department of Defense announced that Oshkosh Defense had been awarded a production contract for 2,244 MRAP All Terrain Vehicles (M-ATV) to address the immediate need for vehicles in Afghanistan. In October 2009, the first M-ATV were shipped to Afghanistan.[86]

Post-war applications[]

With the end of the Iraq War and the drawdown of the War in Afghanistan, there was some question as to what to do with MRAPs, as they were designed specifically for asymmetric warfare. The Army decided they would keep them in some sort of service post-war. Of the approximately 20,000 MRAPs in service, 30% (6,000) will stay in brigade combat teams as troop transports and route clearance vehicles, 10% (2,000) will be used for training, and 60% (12,000) will go into storage. MRAPs are to be superseded by the Joint Light Tactical Vehicle when it enters service in 2016. It still may be used until 2022, when the JLTV is in use in sufficient numbers.[87]

On October 1, 2012, the Pentagon officially closed the MRAP production line. As of that date, 27,740 MRAP vehicles of all types had rolled off the assembly lines of seven manufacturers, and 12,726 vehicles were still in the Afghanistan theater of operations. About 870 were sold to foreign militaries, with 700 on foreign order.[88]

In early July 2012, five MRAP vehicles were delivered to the 2nd Infantry Division in the Korean Peninsula. The 2ID tested over 50 vehicles to see how they would be used by American troops in the region and if their capabilities were right for Korea. The vehicles would enhance protection against tens of thousands to millions of mines buried along the Korean Demilitarized Zone. In addition to force protection, the MRAPs provided a platform for "mission command-on-the-move" to give commanders communications and command-and-control capabilities while moving across the battlefield. Most, if not all, of the MRAPs delivered in Korea were deployed to Iraq or Afghanistan and were refurbished in the U.S. Previous combat experiences would determine how to best use the vehicles in South Korea. Integration into 2ID formations was to take less than a year, with positioning on the front line the following year.[89] U.S. Military officials said the MRAPs were brought in to determine whether they would enhance their ability “to preserve peace and deter aggression on the Korean peninsula.” North Korean Military officials claimed they would be used to safely cross the DMZ to mount an all-out attack on the North, and said the forward deployment of such military hardware disturbed peace and stability in the region. However, by August 2013, the 2ID had decided not to utilize the over 80 MRAPs on the peninsula. They determined the vehicles were “not suitable for maneuver battalions to use” and that there are no plans to add MRAPs to their fleet in the foreseeable future. The vehicles were returned to the Army fleet management system for use in more suitable regions.[90]

Navistar Defense is pitching its MaxxPro MRAP as a vehicle that can be upgraded into a mobile command post or power generator. With budget cuts, the plan would allow the Army to get solutions they want from the existing fleet. At Association of the United States Army 2013, a version called the Mission Command on the Move (MCOTM) was displayed as a command post with monitors, computers, and antennae mounted in the back for communications and surveillance. Five passengers can monitor incoming information, see unmanned aerial vehicle feeds, and keep track of where units are operating. The vehicle has an on-board transmission-integrated power generator that can produce up to 120 kilowatts of exportable power, which eliminates the need for a towed trailer and can single-handedly power a semi-permanent tactical operations center. It would allow commanders to be connected to dismounted troops and headquarters while on the move. The MCOTM version will undergo testing at the Army's network integration evaluations in February 2014.[91][92]

Post-war reductions[]

As of September 2013, the U.S. Marine Corps had 3,700-3,800 MRAP vehicles. The service plans to reduce the numbers in their inventory to 1,200-1,300 due to sequestration budget cuts.[93]

8,700Oshkosh M-ATVvehicles were purchased by the U.S. Army, U.S. Marine Corps, and U.S. Special Operations Command beginning in 2009 for use in Afghanistan. As part of the overall divesture of the wartime MRAP fleet, the U.S. Government will keep about 5,600 M-ATVs, with some 250 vehicles for SOCOM.[94]

About 9,000 Navistar MaxxPro vehicles were bought by the Army from 2007 to 2011, and they plan to keep only about 3,000 of them.[91][92]

Law enforcement[]

FBI Mine Resistant Ambush vehicle

FBI Mine Resistant Ambush vehicle.

United States Department of Homeland Security Rapid Response Teams have used MRAPs while assisting people affected by natural disasters such as hurricanes.[95][96] The Department of Homeland Security has also used MRAP-style vehicles while fighting illegal narcotics smuggling.[97] The Federal Bureau of Investigation used an MRAP-type vehicle in a kidnapping and hostage case in Midland, Alabama.[98]

Police departments inside the United States are acquiring MRAP vehicle through the 1033 program, which allows the Defense Department to redistribute equipment it no longer needs to state and municipal agencies. Rather than buying a new vehicle, which would cost $535,000-$600,000 to produce, some police departments like the Ohio State University Police Department have picked up surplus MRAPs from the Pentagon for free. By October 2013, nearly dozen departments in several states had acquired the armored vehicles. Domestic agencies plan to use them in disaster relief roles, as they can go through flooded areas unlike normal police armored vehicles, and to respond to terrorist threats, like playing a role in guarding sports stadiums. MRAPs used by police forces have the machine gun turret removed and are repainted from their original flat desert tan to black. Organizations have become critical about police use of military vehicles and worried about police militarization. Proponents of the domestic acquisitions say MRAPs fill the roles as standard police Lenco BearCat armored vehicles, but they cost $200,000 while MRAPs can be received for free.[99]

In early October 2013, the Northwest Regional SWAT team of United States received a BAE Caiman 6x6 MRAP. The armored vehicle will primarily be used for rescue situations. In a situation with a gunman, it could be put in between them and personnel. In a natural disaster situation like a flood or blizzard, the Caiman could drive through feet of water or snow and possibly rescue people trapped in their homes. The Caiman normally costs $412,000, but was obtained for no cost through a federal program to give surplus military equipment to law enforcement agencies. Northwest Regional SWAT was on a waiting list for over a year for a vehicle before receiving the Caiman.[100]

See also[]

References[]

  1. "First MRAP vehicles delivered to Iraq". http://defense-update.com/newscast/1107/news/081107_mrap.htm. 
  2. Russell, Robert W (2009). Does the MRAP meet the U.S. Army's needs as the primary method of protecting troops from the IED threat? (Master of Military Art and Science thesis). US Army Command and General Staff College. http://www.dtic.mil/dtic/tr/fulltext/u2/a502075.pdf. 
  3. [1][dead link]
  4. 4.0 4.1 4.2 Defense Tech: Frag Kit 6 to go on MRAPs[dead link]
  5. [2][dead link]
  6. [3][dead link]
  7. 7.0 7.1 7.2 7.3 "MRAP Vehicle Order: 1,000 Cougars to be Turned Loose[dead link] ." Defense Industry Daily. 25 Apr 2007.
  8. Marines Urge Caution on MRAP Fielding
  9. Another Casualty of the Surge
  10. 10.0 10.1 Armored Vehicle Cut Threatens Industry
  11. "Error: no |title= specified when using {{Cite web}}". USA Today. http://www.usatoday.com/news/graphics/ied-deaths/flash.htm?tabNum=tab1. Retrieved 2010-05-13. 
  12. 12.0 12.1 Surge in vehicle orders calls for unconventional buying methods[dead link]
  13. The truck the Pentagon wants and the firm that makes it - USATODAY.com
  14. Military.com Article
  15. Roadside bombs decline in Iraq - USATODAY.com
  16. Dan Lamothe (9). "New weapons, war dogs eyed to fight IEDs". Gannett Government Media Corporation. http://www.marinecorpstimes.com/news/2011/05/marine-corps-ied-afghanistan-george-flynn-050911w/. Retrieved 9 May 2011. 
  17. US Army: 17,000 MRAP Vehicles to Replace Hummers?[dead link] Defense Industry Daily. 11 May 2007.
  18. "BAE Systems completes acquisition of Armor Holdings Inc." (PDF). BAE Systems plc. 2007-07-31. http://www.baesystems.com/Newsroom/NewsReleases/autoGen_107631191035.html. Retrieved 2008-08-06. [dead link]
  19. "MRAP04 | Flickr - Photo Sharing!". Flickr. 2012-05-07. https://www.flickr.com/photos/10393857@N03/7158240674. Retrieved 2013-11-16. 
  20. More Attacks, Mounting Casualties, Washington Post
  21. Eisler, Peter (2007-10-02). "The truck the Pentagon wants and the firm that makes it". USA Today. http://www.usatoday.com/news/military/2007-08-01-force-protection-mraps_N.htm. Retrieved 2010-05-13. 
  22. 22.0 22.1 Force Protection, Inc. - In the News[dead link]
  23. MRAP: Survivable Rides, Start Rolling[dead link]
  24. 24.0 24.1 DefenseLink: Contracts for Thursday, May 31, 2007
  25. 25.0 25.1 USMC, Army Release Orders for more than 2500 Armored Vehicles
  26. "BAE's Diverse MRAP Orders[dead link] ." Defense Industry Daily. 13 Nov 2007.
  27. "BAE's Diverse MRAP Orders." Defense Industry Daily. 13 Nov 2007.
  28. 28.0 28.1 28.2 ""MRAP Orders Approach 5,000". Archived from the original on 2008-02-05. http://web.archive.org/web/20080205114628/http://www.marines.mil/marinelink/mcn2000.nsf/0/392158BE6C6E5AE9852573170073B9C4?opendocument. ." marines.mil July 13, 2007.
  29. More MRAPs: Navistar’s MaxxPro Maintains the Pole Position - Defense Industry Daily
  30. 30.0 30.1 General Dynamics News - August 8, 2007
  31. General Dynamics Wins MRAP Orders of Its Own - Defense Industry Daily
  32. "Cougar Armored Trucks to Stalk Mines on the Battlefield (updated)." Defense Industry Daily. 12 Nov 2007.
  33. Borak, Donna. "Pentagon orders 2,400 armored vehicles". Archived from the original on 2007-11-11. http://web.archive.org/web/20071111055805/http://www.businessweek.com/ap/financialnews/D8SBU09O0.htm. 
  34. USMC Releases New Orders for 2,288 MRAPs
  35. TheStreet.com : Navistar Wins Big MRAP Order | Aerospace/Defense | FRPT NAVZ
  36. [4][dead link]
  37. General Dynamics to Supply 773 RG-31 MRAP Vehicles to U.S. Defense Department[dead link]
  38. News
  39. Militaryindustrialcomplex.com Defense Contracts Listing for 7/31/2009
  40. Donnelly, Tom, Why Gates is wrong, Armed Forces Journal
  41. Armor Holdings, Inc. Receives $518 Million MRAP Award[dead link]
  42. DefenseNews.com - U.S. Marines Order 1,170 MRAPs - 07/13/07 18:55
  43. "MRAP Advance Purchase #2: Oshkosh, PVI & GD[dead link] ." Defense Industry Daily. 06 Mar 2007.
  44. MRAP: Survivable Rides, Start Rolling[dead link]
  45. Cougar Armored Trucks to Stalk Mines on the Battlefield (updated)[dead link] . Defense Industry Daily. 12 Nov 2007.
  46. DefenseNews.com - U.S. Orders 1,200 MRAPs - 05/31/07 12:56
  47. DefenseNews.com - DoD Orders 2,400 MRAPs from 3 Firms - 10/18/07 20:23
  48. "Textron's M1117 Removed from MRAP Competition[dead link] ." Defense Industry Daily. 18 May 2007.
  49. Pentagon rejects Oshkosh’s truck design | Business | Rhode Island news | projo.com | The Providence Journal[dead link]
  50. MRAP: Another One Bites the Dust? - Defense Industry Daily
  51. MRAP: Oshkosh Entries Stalled on 2 Fronts - Defense Industry Daily
  52. MRAPs on the march - Jane's Land Forces News
  53. U.S. Marine Corps Awards $8.5 Million Contract for Category II Mine-Resistant Ambush Protected (MRAP) Vehicles to International Military and Government, LLC[dead link] .
  54. Defense Tech: Corps Asks for MRAP Slowdown[dead link]
  55. Andrew Krepinevich and Dakota Wood. Of IEDs and MRAPs: Force Protection In Complex Irregular Operations."
  56. InsideDefense.com NewsStand: The Insider[dead link]
  57. 57.0 57.1 Mitchell, Bryan; Andrew Scutro, Kris Osborn (July 3, 2008). "SF deaths come amid MRAP rollover concerns: Three soldiers drowned after RG-31 rolled into canal in Afghanistan". http://www.armytimes.com/news/2008/07/marines_MRAP_070108w/. 
  58. The 2d Cavalry Assn News Center » A new age in troop protection
  59. Vanden Brook, Tom (2007-12-16). "Long-term needs lessen, but vehicles still sought". USA Today. http://www.usatoday.com/news/military/2007-12-16-MRAP_N.htm. Retrieved 2008-08-03. 
  60. Associated Press: Fatal MRAP accidents prompt warnings[dead link]
  61. Bryce, Robert (2007-01-22). "Surge of danger for U.S. troops". Salon.com. http://www.salon.com/news/feature/2007/01/22/ieds/index.html. Retrieved 2008-08-03. 
  62. Vanden Brook, Tom (2007-05-31). "MRAPs can't stop newest weapon". USA Today. http://www.usatoday.com/news/world/iraq/2007-05-31-mrap-insurgents_N.htm. Retrieved 2008-08-03. 
  63. Weapons: Dealing With EFPs
  64. "Biden MRAP Amendment Speech" (DOC). http://www.defenseindustrydaily.com/files/2007-03-28_Biden_MRAP_Amendment_Speech.doc. 
  65. Michaels, Jim (July 18, 2008). "EFPs in Iraq drop 70 percent in 3 months". Army Times. http://www.armytimes.com/news/2008/07/gns_efp_071708/. 
  66. 66.0 66.1 TURNER, KEVIN (2008-02-02). "Army's new protective vehicle saved soldier's life in Iraq". The Florida Times-Union. Jacksonville.com. http://jacksonville.com/tu-online/stories/020208/met_242926844.shtml. 
  67. Farrell, Stephen (2008-01-22). "Hopes for Vehicle Questioned After Iraq Blast". The New York Times. http://www.nytimes.com/2008/01/22/world/middleeast/22vehicle.html?pagewanted=1&_r=1&ei=5088&en=147b65d317fbd6fe&ex=1358658000&partner=rssnyt&emc=rss. Retrieved 2010-05-13. 
  68. Tait, Paul (2008-01-22). "US suffers first death in new armoured truck". Reuters. http://www.reuters.com/article/latestCrisis/idUSL22400735. 
  69. Hopes for NY Times Reporting Questioned After MRAP Story - Defense Industry Daily
  70. Weekly Standard: MRAP Confusion
  71. Diversity Adds Depth to MRAP
  72. Armored Vehicle Cut Threatens Industry
  73. Washington Pulse[dead link]
  74. 74.0 74.1 "Logistics: The Bottleneck". Strategypage.com. 2010-03-22. http://www.strategypage.com/htmw/htlog/20100322.aspx. Retrieved 2013-11-16. 
  75. USAF Hires Russian Jets[dead link]
  76. Army.com - Sealift of MRAP vehicles begins[dead link]
  77. General: Army Will Need Fewer MRAPs
  78. Vanden Brook, Tom (2007-12-19). "Military sets sights on at least 15,000 MRAPs". USA Today. http://www.usatoday.com/news/military/2007-12-19-mraps_N.htm. Retrieved 2008-08-03. 
  79. Ideal Innovations, Inc. - News Archive[dead link]
  80. USA Issues MRAP-II Solicitation - Defense Industry Daily
  81. Marine Corps Systems Command Launches MRAP II Solicitation
  82. FILE | 23 | Mine Resistant Ambush Protected Vehicles (MRAP) II Enhanced Vehicle Competitive | 02-Aug-07 - FBO#2075
  83. EFP Mines? Ceradyne & i3 Say “Bull!&#8221
  84. http://www.armytimes.com/news/2008/07/defense_MRAP_II_070308/
  85. Pentagon may buy shorter, lighter MRAPs - Army News, opinions, editorials, news from Iraq, photos, reports - Army Times
  86. Skillings, Jonathan (2009-10-01). "Pentagon ships new M-ATVs to Afghanistan | Cutting Edge - CNET News". News.cnet.com. http://news.cnet.com/8301-11386_3-10365288-76.html. Retrieved 2013-11-16. 
  87. Army Refining Long Term MRAP Plan - Military.com, May 25, 2012
  88. Pentagon shuts MRAP production line - DoDBuzz.com, October 1, 2012
  89. MRAPs represent new tool on contentious Korean peninsula - Stripes.com, 12 July 2013
  90. MRAP No Good for Korea, 2ID Decides - Military.com, 16 August 2013
  91. 91.0 91.1 Industry Working To Give the MRAP New Life - Defensenews.com, 21 October 2013
  92. 92.0 92.1 Navistar Pitches New Uses for Old MRAPs - DoDBuzz.com, 23 October 2013
  93. Corps to Industry: Prepare for the Worst - DoDBuzz.com, 26 September 2013
  94. Oshkosh Defense is working on a deal with Saudi Arabia for the sale of M-ATV MRAP vehicles - Armyrecognition.com, 29 September 2013
  95. HSI Rapid Response Team saves 14 stranded by Hurricane Isaac
  96. ICE gives full effort to helping personnel affected by Hurricane Sandy
  97. Multi-agency probe deals death blow to 'billion dollar' drug ring .
  98. "FBI — Photos of Alabama Bunker Exterior Released". Fbi.gov. http://www.fbi.gov/news/news_blog/photos-of-alabama-bunker-exterior-released. Retrieved 2013-11-16. 
  99. Police Are Getting the Military’s Leftover Armored Trucks - NYtimes.com, 11 October 2013
  100. United States Nortwest Regional SWAT Team is now equipped with Caiman 6x6 MRAP vehicle - Armyrecognition.com, 3 November 2013

External links[]


All or a portion of this article consists of text from Wikipedia, and is therefore Creative Commons Licensed under GFDL.
The original article can be found at MRAP and the edit history here.
Advertisement