Military Wiki
m (1 revision: Import USNShips part 5)
m (→‎top: Reformat infobox for ships articles)
Tag: apiedit
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
{{Infobox ship
{{Use dmy dates|date=November 2012}}
 
 
|Ship image=[[File:USCGC Zephyr (WPC-8).jpg|300px|USCGC ''Zephyr'' (WPC-8)]]
 
{|{{Infobox ship begin}}
 
{{Infobox ship image
 
|Ship image=[[Image:USCGC Zephyr (WPC-8).jpg|300px|USCGC ''Zephyr'' (WPC-8)]]
 
 
|Ship caption=USCGC ''Zephyr'' (WPC-8)
 
|Ship caption=USCGC ''Zephyr'' (WPC-8)
  +
|module={{Infobox ship career|embed=yes
}}
 
{{Infobox Ship Career
 
|Hide header=
 
 
|Ship country=US
 
|Ship country=US
 
|Ship flag={{USN flag|2004}} {{shipboxflag|United States|coast guard}}
 
|Ship flag={{USN flag|2004}} {{shipboxflag|United States|coast guard}}
|Ship name=
 
|Ship namesake=
 
|Ship owner=
 
|Ship operator=
 
|Ship registry=
 
|Ship route=
 
 
|Ship ordered=3 August 1990
 
|Ship ordered=3 August 1990
 
|Ship builder=[[Bollinger Shipyards]], Lockport, Louisiana
|Ship awarded=
 
|Ship builder=[[Bollinger Shipyards]], [[Lockport, Louisiana]]
 
|Ship original cost=
 
|Ship yard number=
 
|Ship way number=
 
 
|Ship laid down=6 March 1993
 
|Ship laid down=6 March 1993
 
|Ship launched=3 December 1993
 
|Ship launched=3 December 1993
|Ship sponsor=
 
|Ship christened=
 
|Ship completed=
 
 
|Ship acquired=16 August 1994
 
|Ship acquired=16 August 1994
 
|Ship commissioned=15 October 1994
 
|Ship commissioned=15 October 1994
|Ship recommissioned=
 
 
|Ship decommissioned=1 October 2004
 
|Ship decommissioned=1 October 2004
|Ship maiden voyage=
 
|Ship in service=
 
|Ship out of service=
 
|Ship renamed=
 
|Ship reclassified=
 
|Ship refit=
 
|Ship struck=
 
|Ship reinstated=
 
 
|Ship homeport= Little Creek, Virginia
 
|Ship homeport= Little Creek, Virginia
|Ship identification=
 
|Ship motto=
 
|Ship nickname=
 
|Ship honours=
 
|Ship honors=
 
|Ship captured=
 
 
|Ship fate=Loaned to the United States Coast Guard 2004-2011, transferred back to the U.S Navy late 2011
 
|Ship fate=Loaned to the United States Coast Guard 2004-2011, transferred back to the U.S Navy late 2011
|Ship status=
 
|Ship notes=
 
 
|Ship badge= [[File:USS Zephyr PC-8 Crest.png|150px]]<br>[[File:USCGC Zephyr WPC-8 Crest.png|150px]]
 
|Ship badge= [[File:USS Zephyr PC-8 Crest.png|150px]]<br>[[File:USCGC Zephyr WPC-8 Crest.png|150px]]
 
}}
 
}}
{{Infobox ship characteristics
+
|module2={{Infobox ship characteristics|embed=yes
 
|Hide header=
 
|Hide header=
 
|Header caption=
 
|Header caption=
Line 91: Line 56:
 
|Ship notes=
 
|Ship notes=
 
}}
 
}}
|}
+
}}
   
 
'''USS ''Zephyr'' (PC-8)''' is a [[Cyclone class patrol ship|''Cyclone'' class]] patrol coastal ship in the [[United States Navy]].
 
'''USS ''Zephyr'' (PC-8)''' is a [[Cyclone class patrol ship|''Cyclone'' class]] patrol coastal ship in the [[United States Navy]].
   
''Zephyr'' is the eighth ship of thirteen in the ''Cyclone''-class. All ships in this class are named after [[weather]] elements. ''Zephyr'' is the first Navy vessel to bear the name. She was laid down 6 March 1993, by [[Bollinger Shipyards]], [[Lockport, Louisiana]] and launched 3 December 1993. She was [[ship commissioning|commissioned]] on 14 October 1994 and decommissioned 1 October 2004 and transferred to the [[United States Coast Guard]] as '''USCGC ''Zephyr'' (WPC-8)'''.
+
''Zephyr'' is the eighth ship of thirteen in the ''Cyclone''-class. All ships in this class are named after weather elements. ''Zephyr'' is the first Navy vessel to bear the name. She was laid down 6 March 1993, by [[Bollinger Shipyards]], Lockport, Louisiana and launched 3 December 1993. She was commissioned on 14 October 1994 and decommissioned 1 October 2004 and transferred to the [[United States Coast Guard]] as '''USCGC ''Zephyr'' (WPC-8)'''.
   
 
The CGC ''Zephyr'' was the first cutter deployed to respond to the [[Deepwater Horizon explosion|Deepwater Horizon oil rig fire]].<ref>http://www.deepwaterinvestigation.com/go/doc/3043/621903/</ref>
 
The CGC ''Zephyr'' was the first cutter deployed to respond to the [[Deepwater Horizon explosion|Deepwater Horizon oil rig fire]].<ref>http://www.deepwaterinvestigation.com/go/doc/3043/621903/</ref>
Line 110: Line 75:
   
 
{{Cyclone class patrol coastal ship}}
 
{{Cyclone class patrol coastal ship}}
  +
  +
{{Wikipedia|USS Zephyr (PC-8)}}
   
 
{{DEFAULTSORT:Zephyr (PC-8)}}
 
{{DEFAULTSORT:Zephyr (PC-8)}}
Line 119: Line 86:
 
[[Category:1993 ships]]
 
[[Category:1993 ships]]
 
[[Category:Ships transferred from the United States Navy to the United States Coast Guard]]
 
[[Category:Ships transferred from the United States Navy to the United States Coast Guard]]
 
 
{{US-mil-ship-stub}}
 

Latest revision as of 06:39, 23 May 2016

USS Zephyr (PC-8)
USCGC Zephyr (WPC-8)
USCGC Zephyr (WPC-8)
Career (US) Flag of the United States Ensign of the United States Coast Guard
Ordered: 3 August 1990
Builder: Bollinger Shipyards, Lockport, Louisiana
Laid down: 6 March 1993
Launched: 3 December 1993
Acquired: 16 August 1994
Commissioned: 15 October 1994
Decommissioned: 1 October 2004
Homeport: Little Creek, Virginia
Fate: Loaned to the United States Coast Guard 2004-2011, transferred back to the U.S Navy late 2011
Badge: USS Zephyr PC-8 Crest
USCGC Zephyr WPC-8 Crest
General characteristics
Class & type: Cyclone-class patrol ship
Displacement: 331 tons
Length: 174 ft (53 m)
Beam: 25 ft (7.6 m)
Draught: 7.5 ft (2.3 m)
Speed: 35 knots (65 km/h; 40 mph)
Range: 2,000 nmi (3,700 km; 2,300 mi) at 12 knots (22 km/h; 14 mph)
Complement: 2 officers, 28 men
Armament: (USN) 2 Mk38 chain guns
2 Mk19 grenade launchers
2 .50 (12.7 mm) machine guns
6 Stinger missiles

USS Zephyr (PC-8) is a Cyclone class patrol coastal ship in the United States Navy.

Zephyr is the eighth ship of thirteen in the Cyclone-class. All ships in this class are named after weather elements. Zephyr is the first Navy vessel to bear the name. She was laid down 6 March 1993, by Bollinger Shipyards, Lockport, Louisiana and launched 3 December 1993. She was commissioned on 14 October 1994 and decommissioned 1 October 2004 and transferred to the United States Coast Guard as USCGC Zephyr (WPC-8).

The CGC Zephyr was the first cutter deployed to respond to the Deepwater Horizon oil rig fire.[1]

Zephyr was transferred back to the Navy on 30 September 2011, and is once again designated PC-8.[2][3]

References

This article includes information collected from the Naval Vessel Register, which, as a U.S. government publication, is in the public domain. The entry can be found here.

External links


All or a portion of this article consists of text from Wikipedia, and is therefore Creative Commons Licensed under GFDL.
The original article can be found at USS Zephyr (PC-8) and the edit history here.